Subway closure

The Toronto Transit Commission is re-signaling the Yonge-University-Spadina (YUS) subway line to improve reliability and capacity on Canada’s busiest subway system. To complete the installation, commissioning and testing of this phase of the project, the TTC will close a portion of the subway.

The entire signal system replacement on the YUS, including the new Spadina subway line extension, will be completed by 2020.

During subway closures, crews typically install new cables, trackside signalling equipment or special track work in the tunnels. This work is labour intensive and can’t all occur during the normal maintenance window afforded the TTC each night when subway service ends, though work does continue in those areas each night. Each single day closure saves about five weeks of night work.

Future closures elsewhere on the YUS will be required for the replacement of the entire signal system and track work. Dates and locations will be announced well in advance of those closures.

Critical subway infrastructure – be it signal systems, tunnel structures or track beds – requires constant maintenance and, after more than half a century of service in some cases, full replacement. When complete, the subway system will be more reliable, efficient and provide greater capacity for the TTC’s 1.7 million daily riders.

TTC appreciates and thanks all of its customers, businesses and the public-at-large for their patience and understanding as this work progresses.

See the latest schedule for weekend subway closures.

Benefits of signal upgrades

New Toronto Rocket subway trainSome of the benefits that the ATC upgrades will bring to the system and all TTC subway riders include:

Increased safety

  • Train speed and separation between trains will now be controlled automatically rather than being human controlled
  • Real time central train control with precise train location data

Travel Time Improvements

  • Trains driven automatically reduce travel time as trains always travel as close to the civil speed limit as possible
  • Travel time consistent every run

Lower Operating Costs

  • Train electricity usage will become much more efficient