TTC track work on portion of Line 2 this weekend
This weekend, Nov. 7-8, there will be no subway service on Line 2 between St George and Keele stations only as the TTC conducts maintenance work in the area, including replacing track switches near Ossington and Christie stations.
Maintaining subway infrastructure in a state-of-good-repair is critical to ensuring a safe, reliable transit system. While the TTC does much of its maintenance work on the subway at the conclusion of service each night, it will continue to require weekend closures to complete improvements to infrastructure and signals, such as automatic train control. See below for a list of scheduled closures for the remainder of 2015.
A frequent replacement bus service will operate between St George and Keele stations. Christie Station will be closed but all the other stations will be open for the sale of fare media and for connecting bus and streetcar service.
Wheel-Trans vehicles will be available for customers who require accessible transit. Customers can speak with any uniformed TTC employee at any station to make use of this service.
Regular subway service will resume on Mon., Nov. 9 at 6 a.m. The TTC appreciates the public’s patience and understanding.
Scheduled Closures – 2015:
Nov. 14 (Sat. only): Line 1 – St George to St Clair West
Nov. 21-22: Line 2 – St George to Keele
Dec. 5-6: Line 2 – St George to Keele